I'll wait until the second deck is completed.
Here is all we need:

- get the suites built on the Press Box side
- rebuild the old North end to be closer with a steeper pitch to look like the South part
- if possible extend both upper decks in each direction so they have full sections and you can add more lights which are needed
- elevators for BOTH sides

Done.
 
  • Like
Reactions: colbert17

fatherbill68

Redshirt
Feb 2, 2014
20
21
3
Here is all we need:

- get the suites built on the Press Box side
- rebuild the old North end to be closer with a steeper pitch to look like the South part
- if possible extend both upper decks in each direction so they have full sections and you can add more lights which are needed
- elevators for BOTH sides

Done.
Won't be done until current stadium sells out consistently!
 

HeavenUniv.

Heisman
Sep 21, 2004
135,536
16,405
0
Full stadiums are easier to get when a team has a coach. We just went years without one.
 

DJ Spanky

Heisman
Jul 25, 2001
51,021
63,065
113
- get the suites built on the Press Box side - Biggest bang for the buck, would be a cash cow. Was planned a decade ago, but the recession killed it.
- rebuild the old North end to be closer with a steeper pitch to look like the South part - much more involved than you think. The current North End Zone is built on the remnants of the old stadium - would need to be torn out and footings put in.
- if possible extend both upper decks in each direction so they have full sections and you can add more lights which are needed - as I recall, each deck was shortened due to the 1994 budget being cut
- elevators for BOTH sides
We also need to replace the scoreboard in the North Endzone with something larger and more functional.
 

HeavenUniv.

Heisman
Sep 21, 2004
135,536
16,405
0
I never stopped calling our stadium Rutgers Stadium. I try not to use corporate names with any of the arenas or stadiums. Ex—Phillies Ballpark, New Meadowlands Stadium, Devils Arena. I think I have made an exception for the Carrier Done just so I don’t have to say Syracuse lol.
 
A

anon_ivydyf0amkzay

Guest
Here is all we need:

- get the suites built on the Press Box side
- rebuild the old North end to be closer with a steeper pitch to look like the South part
- if possible extend both upper decks in each direction so they have full sections and you can add more lights which are needed
- elevators for BOTH sides

Done.
Better yet move the press box above the upper deck and build lux boxes along the entire length of the upper deck like on the other side.
Better lighting. What is there is inadequate.
 
The Knight Report

Latest

  1. 01 The Knight Report Rutgers Football Injury Report: Initial Report ahead of the Northwestern game
  2. 02 The Knight Report Join The Knight Report TODAY and get it for 60% off!
  3. 03 On3 Big Ten announces 2026-27 wrestling television schedule
  4. 04 On3 Football ESPN updates FPI rankings for each Big Ten football team after Week 7
  5. 05 Sports Predictions 2026 Big Ten Title Odds: Ohio State remains slight Polymarket favorites despite Julian Sayin injury