FIU touted the bridge to be a first of its kind, tweeting that it swung into place on Saturday.
According to an FIU press release, the 174-foot, 950-ton bridge was just installed "in a few hours" using "accelerated bridge construction" methods, which the university said "reduces potential risks to workers, commuters, and pedestrians and minimizes traffic interruptions."
Wow, searching twitter for fit bridge shows the scene now, but it also shows this:
The bridge was made elsewhere & transported to FIU. Dedication was last weekend & grand opening scheduled for this upcoming weekend. They have been doing stress tests all week including today. It was the stress test that caused the collapse
I find it strange that stress tests would be needed for a new prefab structure, particularly without the side spans in. The design is rather unusual with a center truss and a top (I assume) ornamental piece. The bottom slab which would support peds is rather slender. Railings were not yet installed. It might have been a construction load that was not anticipated in design which caused the failure. Just speculating and feel for all involved. FIU is considered a leader in ABC techniques and has government work to educate on the various methods.Of course, bridges need stress tests, but doing them when the road underneath is being driven on? Is this really about not wanting to pay people overtime to work late night?
Prefabbed in China of recycled cardboard seems like.I find it strange that stress tests would be needed for a new prefab structure, particularly without the side spans in. The design is rather unusual with a center truss and a top (I assume) ornamental piece. The bottom slab which would support peds is rather slender. Railings were not yet installed. It might have been a construction load that was not anticipated in design which caused the failure. Just speculating and feel for all involved. FIU is considered a leader in ABC techniques and has government work to educate on the various methods.
Thanks. The design makes more sense now and more typical.From what I've picked up, the bridge was several months short of completion. According to artist renderings, the bridge was getting towers and would be cable stayed. Maybe folks thought it could be built without more preliminary support, or maybe bad materials? I recall when Boston "Big Dig" tunnel roofs collapses because epoxies were used wrong
![]()
![]()
I happened to watch another show on Chernobyl last week and that story was similar in that they were performing tests on the reactor at the same time certain safety features were disabled.Per a TV news report & the Miami News Times:
"2 of the biggest firms that built the FIU bridge that collapsed today have recently been accused of unsafe practicea. In one of those cases another bridge collapsed & fell onto workers."
The bridge was made elsewhere & transported to FIU. Dedication was last weekend & grand opening scheduled for this upcoming weekend. They have been doing stress tests all week including today. It was the stress test that caused the collapse
Unfortunately, the press release from Saturday seemed to take particular pride in that construction of this type of bridge was going to "minimize disruption to traffic".From some of the photos, there seems to be evidence that the top of the center of the span crushed under its own weight or weight plus construction load. Concrete is strong in compression but that top member looked small to support a span of that length, particularly with voids for lighting, which can be seen in the installation video.
I have read a little more since I posted and while some people said there were stress tests going on, evidently some witnesses say a crane broke a cable and dropped something on the bridge then it collapsed.For all construction of this magnitude , calculations are required that the partial construction could stand on it's own. Also the concrete would be tested to verify strength. Factors of safety are required (although smaller factors for temporary conditions). Somewhere there was either a major screwup or loads were added to the bridge that were not intended to be added.. Either the calcs were blown or something was changed at a latter date and not rechecked.
Why would they be doing a stress test while cars are traveling underneath?Per a TV news report & the Miami News Times:
"2 of the biggest firms that built the FIU bridge that collapsed today have recently been accused of unsafe practicea. In one of those cases another bridge collapsed & fell onto workers."
The bridge was made elsewhere & transported to FIU. Dedication was last weekend & grand opening scheduled for this upcoming weekend. They have been doing stress tests all week including today. It was the stress test that caused the collapse
Doesn't make sense. Also you only do these type of tests when it is doubtful of existing material strength (old bridges).Why would they be doing a stress test while cars are traveling underneath?
A student was killed a year ago crossing that busy road, which is why they invested in this bridge. Look to Vegas for a great example of how much safer traversing The Strip is on foot now vice when all foot traffic was at grade. Traffic flows more smoothly and pedestrians are away from vehicular traffic for nearly a mile. Sure pedestrians will generally prefer the path of least resistance, so you make the other paths untenable. In Vegas they do that through fencing that prevents people from walking across traffic.Not a fan of pedestrian bridges given that they take more time and effort for the pedestrian to use it than to use the at-grade signalized crosswalk to cross the street.Also factor in the time and effort to go upstairs/ramp then downstairs/ramp on the other end. Or wait for the elevators. Pedestrian are like water, they follow the path of least resistance (and the straightest line possible from Point A to Point B).
True. Accusations that the bridge was being put in to improve traffic are ridiculous.A student was killed a year ago crossing that busy road, which is why they invested in this bridge. Look to Vegas for a great example of how much safer traversing The Strip is on foot now vice when all foot traffic was at grade. Traffic flows more smoothly and pedestrians are away from vehicular traffic for nearly a mile. Sure pedestrians will generally prefer the path of least resistance, so you make the other paths untenable. In Vegas they do that through fencing that prevents people from walking across traffic.
CEMENT DUST!!! That's the culprit right there!The newspaper, citing Occupational Safety Health Administration records, also said MCM has been slapped with fines totaling more than $50,000 during the past five years for 11 safety violations, which included complaints about cement dust and unsafe trenches at construction sites.
Again, though, this type of situation has to be put in context of that overall construction project.The Virginia Department of Labor cited Figg for four violations in 2012 after a 90-ton slab of concrete fell from a bridge it was building near Norfolk, according to the Miami Herald.
Figg was hit with a $28,000 fine and the Department of Labor said the company modified a girder without properly inspecting it or getting written consent from its manufacturer, The Virginian-Pilot reported.
If you look at the video showing how it was going to look when it completed, it seems it was not designed as a way to just get you from point A to point B. It is much wider than you would think for a walkway, had places to sit down, etc. It was almost like they were trying to add some "open" space to an otherwise congested area.Why do you need a 950 ton bridge for a walkway? A metal walkway that allowed 20 people to cross at the same time as opposed to the 950 ton bridge that accommodate 5,000 people crossing at the same time. The current cost is over 19 million as opposed to maybe 5 million.
Who would want to hang out and relax sitting on a bridge over a highway? Did it offer views of something scenic? Seems bizarre.If you look at the video showing how it was going to look when it completed, it seems it was not designed as a way to just get you from point A to point B. It is much wider than you would think for a walkway, had places to sit down, etc. It was almost like they were trying to add some "open" space to an otherwise congested area.
Here's a still pulled from the architect's video of what the finished product would look like.Who would want to hang out and relax sitting on a bridge over a highway? Did it offer views of something scenic? Seems bizarre.
Who would want to hang out and relax sitting on a bridge over a highway? Did it offer views of something scenic? Seems bizarre.
If there is a video of the collapse, I would like to see it. I think there's a good chance that it would be the property of either FIU or Figg for marketing reasons to have a time lapse video of the build.I see where there's actual video of the collapse - I would expect them to dissect that frame by frame to help diagnose the root cause of the failure.
There is gonna be a LOT of finger pointing on this one!
CEMENT DUST!!! That's the culprit right there!
Looks, I know these companies cut corners, but pointing back to BS like that is completely counterproductive.
This is something more to the point:
Again, though, this type of situation has to be put in context of that overall construction project.
Ultimately part of this is gonna come back against FIU as they were in favor of this hurry-up construction technique.
Who would want to hang out and relax sitting on a bridge over a highway? Did it offer views of something scenic? Seems bizarre.
If there is a video of the collapse, I would like to see it. I think there's a good chance that it would be the property of either FIU or Figg for marketing reasons to have a time lapse video of the build.
The Knight Report
How to watch Rutgers / Penn State; Pregame Info, Spread, More: Gameday Central
The Knight Report
Rutgers Football Injury Report: Latest ahead of the Penn State game
The Knight Report
Join The Knight Report TODAY and get it for 50% off!
The Knight Report
Rutgers Football vs. Penn State Preview + Players Era 8 Basketball Recap - TKR Pod
The Knight Report
WAR ROOM: Latest Recruit Scoop and Team News on Rutgers Athletics