First up are pics from Jun 17
The Dawgzillatron still had a couple paint spots to be finished as can be seen in these photos. You can see the Broken G on the Seal Building sign.
Work being down on the East side, repainting..touchup work. They began at the North end
Some Photos of the 100 level, just to give people how easy of an idea it will be in the near future to convert the 100 and 200 levels to club/suites.
The only thing that needs to be removed is this 2" plywood wall
and these free-standing concrete stands that are concrete block but not connected up to the top of the stadium.
</p>This photo shows the distance between the fenct and the base of the jumbotron, Doing a rough measure it came to 40-45'.
Pic of the brick base along the bottom.
Pic of the LT scoreboard</p>
</p>Pic of the Greg Bryne Scoreboard
The Dawgzillatron still had a couple paint spots to be finished as can be seen in these photos. You can see the Broken G on the Seal Building sign.
Work being down on the East side, repainting..touchup work. They began at the North end
Some Photos of the 100 level, just to give people how easy of an idea it will be in the near future to convert the 100 and 200 levels to club/suites.
The only thing that needs to be removed is this 2" plywood wall
and these free-standing concrete stands that are concrete block but not connected up to the top of the stadium.
</p>This photo shows the distance between the fenct and the base of the jumbotron, Doing a rough measure it came to 40-45'.
Pic of the brick base along the bottom.
Pic of the LT scoreboard</p>
</p>Pic of the Greg Bryne Scoreboard