They didn't show or say what they are gonna do on the inside. Pool, bowling alley, game room, lounge area, barbershop, Adidas displaying the football gear and jerseys, and etc. They should add something different that other colleges don't have.
 

huskerssalts

All-Conference
Oct 6, 2014
7,213
2,216
0
They didn't show or say what they are gonna do on the inside. Pool, bowling alley, game room, lounge area, barbershop, Adidas displaying the football gear and jerseys, and etc. They should add something different that other colleges don't have.

Right, I was hoping to see some designs or at least hear something more about it. Maybe we will see more later and this was the initial release.
 
Aug 6, 2009
15,511
9,089
0
They didn't show or say what they are gonna do on the inside. Pool, bowling alley, game room, lounge area, barbershop, Adidas displaying the football gear and jerseys, and etc. They should add something different that other colleges don't have.
I agree. The video I saw doesn’t show much. And it doesn’t look like something that will cause us to stand out from the crowd.
 

planored

All-Conference
Aug 5, 2003
14,113
2,168
0
Maybe they want to show all the visitors this weekend first, there will be more. Hell, be excited 155m on new facilities, I am sure they will be bad ***. Plus the 2020 class will be in 2nd year when finished
 

Ewooc

All-Conference
Nov 29, 2010
6,114
3,053
0
I agree. The video I saw doesn’t show much. And it doesn’t look like something that will cause us to stand out from the crowd.
That seems to be the general consensus of many. The outside is pretty basic. Now granted, Im sure they didn't want it to stick out like a sore thumb compared to all the other buildings and stadium. To maybe seem like it has always been.
 
Aug 6, 2009
15,511
9,089
0
That seems to be the general consensus of many. The outside is pretty basic. Now granted, Im sure they didn't want it to stick out like a sore thumb compared to all the other buildings and stadium. To maybe seem like it has always been.
To me it looks boring. Count me among the disappointed.
 

Harry Caray

All-American
Feb 28, 2002
71,007
7,235
113
They didn't show or say what they are gonna do on the inside. Pool, bowling alley, game room, lounge area, barbershop, Adidas displaying the football gear and jerseys, and etc. They should add something different that other colleges don't have.

Agree, I found it strange they didn't show renderings of the inside at all. I hope it's not just a bigger version of what we already have. With Frost being at Oregon all those years, I can't imagine that it will be underwhelming. Maybe they are waiting until tomorrow to reveal more?
 
Aug 6, 2009
15,511
9,089
0
Don’t be,these are just preliminary designs.. Like our football team we need to be patient with the final results..
I gotcha. And I agree, this is all very preliminary. But I had experience at my former university where I was a faculty rep to the committee that oversaw construction of new facilities. And my experience is that projects get scaled down, not up, from the preliminary plans. Budget constraints and cost overruns always cause corners to be cut and “frills” to be eliminated. That is why I am disappointed with these initial sketches. They don’t represent the “thinking big and out of the box” approach you need at the start. You begin big and then scale back as needed. Not usually the other way around.
 
Sep 29, 2001
75,439
12,977
0
They're not going to flaunt the bells and whistles to the public to avoid any political backlash about "extravagance". The flaunting will only be done privately for visiting recruits. JMO.
 

EATAFAT1

Senior
Oct 10, 2009
1,567
898
0
I think every year they should have a cornfield on top of that one building there to the right.
 

TruHusker

All-Conference
Sep 21, 2001
12,119
2,403
98
Well......my experience in doing projects is the drawings that are made determine the costs and mean something. I have never seen a drawing presented to the public and something else done.

I get the feeling it first needs to fit with the rest of the campus and second, they are going for square footage. The outside may be blah but I really could care less, one it is up, you don't spend time looking at it. You spend time in th inside in locker rooms, athlete areas, trainging areas, weights, etc. Shoot, make it a metal building for all I care, a really nice one but HUGE and bells and bling galore on the inside.

I want the part the athletes get to use where the money is spent. That goes back to my philosophy for students as well. But I am old so there that.
 

GeauxBigRed

All-Conference
Oct 4, 2014
1,734
2,447
113
This is 3 times as much money as Clemson put into their facilities and about 20 million less than UAB’s new stadium is projected to cost, I feel safe in saying I think it’s going to be amazing.

I get the feeling they probably are not at a point to show renderings of the inside but wanted to capitalize on GameDay being here to announce it. I bet my bottom dollar they will be showing the images on ESPN tomorrow morning.
 

Shimmer003

All-Conference
Feb 25, 2005
10,027
2,631
96
Maybe I’m wrong. But logic tells me it’s literally not possible to spend $155 million on football facilities and have them be anything less than jaw dropping.
 

Kato

Senior
Dec 23, 2006
2,148
594
113
I thought the $155 mil was everything included (football facilities, stadium upgrades and others). I highly doubt the inside is completely planned out and this is just the initial phase.
 

Shimmer003

All-Conference
Feb 25, 2005
10,027
2,631
96
I thought the $155 mil was everything included (football facilities, stadium upgrades and others). I highly doubt the inside is completely planned out and this is just the initial phase.

I could be wrong but I heard that the $155 was just for phase 1 with more to come
 

EATAFAT1

Senior
Oct 10, 2009
1,567
898
0
That sounds great. Imagine all those Scott Frost slacks gracing those halls of greatness.
 
Jan 24, 2004
56,484
17,944
113
https://nebraska.rivals.com/news/fi...ut-nebraska-s-new-football-facility-on-friday
1. The key numbers
Here's what you need to know about Nebraska's new football facility in terms of key numbers. The three-story complex itself will be 350,000 square feet and cost $155 million to build. When NU built the Tom and Nancy Osborne Complex in 2004, the price tag on that facility was $50 million.

Construction on the complex will not begin until after the spring sports season concludes in 2020, and it won't be open for usage until 2022.

2. This project is just the beginning
There is a lot more in store down the road. NU has plans for upgrades in golf, swimming, track and to South Stadium in future phases. None of that can be announced though until it hits a Board of Regents meeting agenda.

Chancellor Ronnie Green told me all of this will be addressed at a later time, but they plan to still have the track named after NU Hall-of-Famer Ed Weir when it's relocated to Innovation Campus.

"We certainly will honor the Weir family," Green said. "Ed Weir was just inducted into our Hall-of-Fame as you know last month. Now we are going to have the opportunity to locate the track on Innovation Campus on the very west side between the Ice Box and the highway just north of Devaney. That facility will be rebuilt and it will give us additional capacity both in tack and soccer, and we will continue to honor the Weir family. You'll hear more about that down the road."



3. What happens to North and West Stadium in the future?
With football moving out of North Stadium and the student life center and training table moving out of West Stadium, there is a lot of square footage NU will be able to put to good use in future years.

The new football complex will connect to North Stadium, and more amenities will be added, including escalators to get people to and from their seats.

As for the current football coaches offices, those will be converted to space for NU's different media departments, including Husker Vision. They want all of their media properties located in the same place.

There will also be major expansion to the athletic medicine space in North Stadium, as NU has outgrown this space and that needs a big overhaul.

In West Stadium, there are plans for where the current training table and student life center sits. The training table kitchen will be converted into a culinary space in the stadium, which they currently do not have. The student life center will be converted into additional club amenities to entertain boosters on game day.



4. When did this become a reality?
Nebraska's Matt Davison said this has been a talking point and discussion for two years at Nebraska, well before the hiring of Scott Frost.

Davison said when Bill Moos was first hired, he mentioned this idea to him and how much it was needed. It was even brought up to Frost on the phone before he took the job.

As for becoming a reality, Davison said that took some time.

"I felt pretty good it was going to happen a couple of months ago probably," Davison said. "We have to raise a lot of money. So far the response has been very good. I've met with many of our donors, and everybody is excited about the project. I feel better today than I did two weeks ago, and better than I did a month ago.

"This was something two years ago though I met with Bill and pitched him the idea and said 'what do you think about this?' Then Scott took the job, and I told Scott about it before he took the job. I said 'hey, we should do this someday.' Right now was the time.

"We have momentum and we have the right coach. I give Scott a ton of credit because when he said yes to this, he thought big. It goes back to his vision and what he wants. He said if we are going to do it, we are going to do it right because that's how he is. He loves Nebraska, and he's going to be here a long, long time, so he wants this building to stand the test of time."

5. Bounds will have a big role in this
Something else we learned this week is former University of Nebraska President Hank Bounds will be heavily involved in this project.

Bounds has been brought in to be a fundraiser for the Foundation, as NU must raise $100 million on their own, and they've already been able to bring in $35 to $40 million of private gifts through the leadership of Bounds.

"His leadership a few months ago kept this thing going," Davison of Bounds. "His leadership helping us meet with the Regents and then transitioning into the philanthropy piece of it. Hank has been a huge piece of this whole thing. I give (current President) Susan Fritz a ton of credit for keeping Hank on in this role to help us with the project."
 

LikeNebraska

All-Conference
Oct 1, 2016
2,756
2,757
0
But I am old so there that.
Well......my experience in doing projects is the drawings that are made determine the costs and mean something. I have never seen a drawing presented to the public and something else done.

I get the feeling it first needs to fit with the rest of the campus and second, they are going for square footage. The outside may be blah but I really could care less, one it is up, you don't spend time looking at it. You spend time in th inside in locker rooms, athlete areas, trainging areas, weights, etc. Shoot, make it a metal building for all I care, a really nice one but HUGE and bells and bling galore on the inside.

I want the part the athletes get to use where the money is spent. That goes back to my philosophy for students as well. But I am old so there that.
You're my boy, Blue.
 

redwine65

All-Conference
Jun 23, 2010
10,858
2,176
113
I figured the south stadium was next, but if you got to keep up with the jones's