Checking construction cam

TheBigDA

Redshirt
Aug 29, 2008
1,758
0
0
Field is getting top dressed, but what are they doing to the top level of addition? Did prep to that area late last night and now something else.
 

mjh94

Redshirt
Mar 3, 2008
1,317
0
36
they are putting the vapor barrier and finish coat of concrete down, i believe.
 

maroonmadman

Senior
Nov 7, 2010
2,530
853
113
I passed by the stadium on Sunday and there was a small crew working. Couldn't tell exactly what they were doing, looked like electrical type work to me, running conduit and pulling wire.
 
Maroon and White

Latest

  1. 01 Maroon and White Jeff Lebby talks Mississippi State Saturday Scrimmage: "A ton of good on good"
  2. 02 On3 UNLV transfer forward Kimani Hamilton signs with Mississippi State
  3. 03 Maroon and White Mississippi State's WR room is a strength, the question is "how strong?"
  4. 04 Maroon and White OL Mario Nash Jr. no longer on Mississippi State roster
  5. 05 Maroon and White Mississippi State WBK adds international transfer Grace Ndubueze