I’m not too sure AI will impact the installers. I could see it affect the engineering firms more than anything. I’m sure it’s being utilized in the field for schedules, but there are way too many variables on commercial and industrial buildings. I’ve ran a lot of jobs big and small and they never go as planned lol. From materials, equipment, personnel, utilities, shipping, owners, pandemics, etc. and multiply that by all the different trades on the job, it can be a real **** show at times.
So in short I’m not disagreeing about AI, I just don’t think it will impact as heavily for us rum dums.